Sunday, February 6, 2011

Can You Buy Fake Angel Bites

AUGI Forums back online

Some users of Revit Structure work with linked Revit models. This could have as the reason that we split a large project in various stages of construction. Or the one including the basements of the excavated soil in a project and everything supernatural, in a second Revit project. Or is separated in reinforcement preform and scarf projects planned projects. There are several reasons to do so. This result
but then sometimes unwanted Things. For example, when I pitch and not as a separate project do, then I have these elements in every project mentioned. I then linking the Revit projects is the result of the following: Scanning and levels of two Revit projects are visible.

The view can override any view but a unique control / the linked Revit project / e. To do this, just go to the override / visibility of the view in which you want to change the appearance. Then click on the tab "Revit Links.

You have now three possibilities for the control of the override / visibilities.
  • "after basic component view": for example, the control grid over the project to which you link to other projects. Turn here, the grid is switched off the grid for the linked project. This setting is also the default
  • "By Linked View": control of the grid as the visibility settings / override from a view of the linked project.
  • "Custom": Allows you succeed to discontinue their needs, the categories of the linked project and the categories of the "host" project. This allows for example the attitude that you view the screen from the host project and off the grid of the linked project can have.
After clicking on "Custom" You can access the model, marking and import categories of the linked project, and there is also showing "Benutzerdefniert" on switch and then adjust the categories according to your needs.

0 comments:

Post a Comment